28 Feb '13, 4pm

window installation with full-thickness masonry: planning for eventual replacement? #green

Basic question: what is the best way to design a window installation behind a masonry full-thickness veneer wall such that eventual window replacement is possible while maintaining the integrity of the drainage plane? I'm building a new house with full-thickness (5") natural stone veneer walls, and am trying to design for durability. Windows will have to be replaced eventually, that is a given. The drainage plane behind masonry is critical to the durability of the wall system. Replacing windows typically involves tearing open the WRB/drainage plane to get at the nailing fins. Yet masonry, typically installed after the window is flashed in, often covers up the nailing fins. How is window replacement even possible, let alone restoration of the drainage plane? It would seem prudent to back off the perimeter of the masonry and install a brickmold, which would cover the nailing...

Full article: http://www.greenbuildingadvisor.com/community/forum/energ...

Tweets

Estate Planning - Page 2

forums.condosingapore.com 02 Mar '13, 9am

There are too many techinical deficiencies in the proposal. Firstly, a will is about closure. If the will does not distrib...

Window quote information and a few questions......

greenbuildingadvisor.com 02 Mar '13, 7am

We will be starting construction on a new 2.400 sq. ft. house in Royal Oak, MI starting mid-May. Our builder is starting t...

WATCH THIS: Schluter-Systems tile installation ...

greenbuildermag.com 08 Mar '13, 12am

Schluter®-Systems is the largest and most innovative provider of tile installation systems in the industry. Schluter's pro...